Close
(0) items
You have no items in your shopping cart.
All Categories
    Filters
    Preferences
    Search

    Nacelle Lifting Assembly

    Call for price

    Lift-It® product specialists worked with the pioneers of the American Wind Industry to develop a sling handling system to replace heavy and damage inflicting, chain slings.

    Lift-It® product specialists worked with the pioneers of the American Wind Industry to develop a sling handling system to replace heavy and damage inflicting, chain slings. Initially, our Synthetic Sling System was used in the manufacturing of wind turbines; High Performance Fiber, Twin-Path® Slings are now used extensively for field installation and maintenance operations. Level, non-damaging handling is achieved through precision sling lengths. Sling longevity is enhanced by special, sling protection at the connection points. These factors, combined with stellar service have made the Nacelle Lifting Assembly the standard for the industry. Whether you are handling 60 or 300 ton turbines, we have a Synthetic Sling System for your application. Complete Handling Systems are readily available. Existing beams can be modified to accept the improved, Nacelle Lifting Assembly.

    All goods are custom made and Non-returnable. Any return must be negotiated, include a return authorization number and will be subject to a restocking fee.

    Lift-It® product specialists worked with the pioneers of the American Wind Industry to develop a sling handling system to replace heavy and damage inflicting, chain slings. Initially, our Synthetic Sling System was used in the manufacturing of wind turbines; High Performance Fiber, Twin-Path® Slings are now used extensively for field installation and maintenance operations. Level, non-damaging handling is achieved through precision sling lengths. Sling longevity is enhanced by special, sling protection at the connection points. These factors, combined with stellar service have made the Nacelle Lifting Assembly the standard for the industry. Whether you are handling 60 or 300 ton turbines, we have a Synthetic Sling System for your application. Complete Handling Systems are readily available. Existing beams can be modified to accept the improved, Nacelle Lifting Assembly.