Close
(0) items
You have no items in your shopping cart.
All Categories
    Filters
    Preferences
    Search

    Tower Lifting Tool

    Call for price

    ADB, a leading manufacturer of Engineered Swivel Hoist Rings recognized the need to develop a handling system specifically for the erection of wind towers. Top and Bottom Tower Placement Rings make the Wind-Worker™ Tower Placement System “a breeze” to use as they eliminate sling binding and fit most towers.


    ADB, a leading manufacturer of Engineered Swivel Hoist Rings recognized the need to develop a handling system specifically for the
    erection of wind towers. Top and Bottom Tower Placement Rings make the Wind-Worker™ Tower Placement System “a breeze” to
    use as they eliminate sling binding and fit most towers. See the Actek Warning for important Safety, Use and Inspection Information.

    1-3/4" Stud Assembly

     

    Customized Upon Request

    For 36 mm holes use 1-1/2” socket head cap screws.
    For 45 mm holes use 1-3/4” stepped studs as shown in the example, below.

     

    Wind-Worker™ Tower Tools are designed to fit bolt patterns that are 11-3/4 to 16 in. (center-to-center). Custom sizes are available on request.


     

    Different Stages of the Lift

     

    Loading and Unloading

    The following illustrations depict the tower and tools at varying stages of the lift.

    Note: The slings are positioned so they do not overlap.

     

    For loading and unloading operations it is necessary to install both Top and Bottom Lifting Tools to avoid overlapping the slings.

     

     

    Install Top Lifting Tools at the following positions: 10.5, 1.5, 4.5 and 8.5 O’clock.
    Install Bottom Tools at the following positions: 10.5 and
    1.5 O’clock.
     

    Always install a bolt or stud through a drilled hole before installation through the slotted side. This will keep the tool from sliding back and forth in the slot.


    Do not put fingers in holes or slots, under any circumstance. For aligning holes, ADB® recommends the use of a locating pin or similar tool.

     

    All goods are custom made and Non-returnable. Any return must be negotiated, include a return authorization number and will be subject to a restocking fee.


    ADB, a leading manufacturer of Engineered Swivel Hoist Rings recognized the need to develop a handling system specifically for the
    erection of wind towers. Top and Bottom Tower Placement Rings make the Wind-Worker™ Tower Placement System “a breeze” to
    use as they eliminate sling binding and fit most towers. See the Actek Warning for important Safety, Use and Inspection Information.

    1-3/4" Stud Assembly

     

    Customized Upon Request

    For 36 mm holes use 1-1/2” socket head cap screws.
    For 45 mm holes use 1-3/4” stepped studs as shown in the example, below.

     

    Wind-Worker™ Tower Tools are designed to fit bolt patterns that are 11-3/4 to 16 in. (center-to-center). Custom sizes are available on request.


     

    Different Stages of the Lift

     

    Loading and Unloading

    The following illustrations depict the tower and tools at varying stages of the lift.

    Note: The slings are positioned so they do not overlap.

     

    For loading and unloading operations it is necessary to install both Top and Bottom Lifting Tools to avoid overlapping the slings.

     

     

    Install Top Lifting Tools at the following positions: 10.5, 1.5, 4.5 and 8.5 O’clock.
    Install Bottom Tools at the following positions: 10.5 and
    1.5 O’clock.
     

    Always install a bolt or stud through a drilled hole before installation through the slotted side. This will keep the tool from sliding back and forth in the slot.


    Do not put fingers in holes or slots, under any circumstance. For aligning holes, ADB® recommends the use of a locating pin or similar tool.